Access Control System Upgrade
Southwest Ohio Regional Transi
Cincinnati, Ohio
Southwest Ohio Regional Transi
Cincinnati, Ohio
Southwest Ohio Regional Transit (SORTA) is procuring an upgrade to its existing electronic Access Control System (ACS), including full migration into its Genetec Security Center (version 5.12) unified security management platform. The project requires replacement of existing door controllers with Genetec-compatible networked units and replacement of card readers (except at the Huntington Center facility), while reusing sensors and cabling to the maximum extent possible.
This bid is 85% technology related
A strong match for technology vendors
Electronic access control system upgrade with Genetec Security Center migration, database import, and networked controller/reader replacement; matches PACS/security tech examples that score high.
Deadline: Aug 3, 2026 at 2:00 PM ET
Always verify deadlines on the original source.
Is the original source link not working? Let us know so we can fix it.
We use AI to analyze and classify bid information. Please verify details at the original source.
Ref No.
TB-210213